A new composite panel production line has been successfully installed and commissioned in the United States.

Release time:2015-09-03 13:46

Abstract:A new composite panel production line has been successfully installed and commissioned in the United States and is now in operation.

WDT6'×12'—An Automated Short-Cycle Veneer Lamination Line Successfully Installed and Commissioned in Iran

Release time:2014-11-06 14:26

Abstract:A new WDT6’×12’—A automatic short-cycle veneer laminating production line has been successfully installed and commissioned in Iran. The equipment’s first trial run was a resounding success, with the very first laminated panel meeting all quality requirements.

New honeycomb panel composite production line commissioned in Zhejiang

Release time:2014-11-06 14:25

Abstract:A new, upgraded honeycomb-panel composite production line for wall applications has been successfully installed, commissioned, and put into operation in Zhejiang.

A new WDT 7’×9’—B high-speed, short-cycle veneer laminating production line has been successfully installed and commissioned in Taiwan.

Release time:2014-11-06 14:24

Abstract:A new WDT 7’×9’—B high-speed, short-cycle veneer laminating production line has been successfully installed and commissioned in Taiwan and is now in operation. Photos of the production line are shown below.

< 1234 >